Case Studies

curve-down
Displaying 190 - 196 of 223
GB flag

Case Studies

One of the largest Bioethanol production plants in Europe was having a failure every 2 months on a group of pumps in the distillation area of the plant, costing over £75,000 per outage.

US flag

Case Studies

A paper mill in Maine, USA was having issues with water and stock getting into their Hydropulper gearbox.

GB flag

Case Studies

A chemical plant was installing a new conveyor system and the onsite engineer had concerns over the OEM sealing options for the plummer block bearings.

AU flag

Case Studies

A coal mine in Australia was using gland packing on 3 coal slurry transfer pumps.

GB flag

Case Studies

A UK based Oil Refinery was having repeated failures on a Coppus 24 Steam Turbine.

PL flag

Case Studies

A brown coal mine in Poland had lip seals fitted on their intermediate shaft bearing housings.

GB flag

Case Studies

Sealing an Aceto Digester feed pump with a dry running gas seal supplied by an AESSEAL competitor.